If you buy Passcert Passcert HCNP-UC(Fast Track) H11-828-ENU practice exam, you will solve the problem of your test preparation. You will get the Passcert HCNP-UC(Fast Track) H11-828-ENU practice exam which have the highest quality. Buy our products today, and you will open a new door, and you will get a better future. We can make you pay a minimum of effort to get the greatest success.Passcert Passcert HCNP-UC(Fast Track) H11-828-ENU practice exam allow candidates to learn in the case of mock examinations.
Share some HCNP-UC H11-828-ENU exam questions and answers below.
eSpace UC solution can provide the recording function via UMS components.
A. True
B. False
Answer: B
In eSpace UC solution providing for mobile client access component is ( ).
A. eServer
B. AA
C. AppAgent
D. MAA
E. U1900
Answer: D
When you configure a AR router in a branch node, in the AR router configuration outside calls, the configuration process is: configure callroute first, and then configure prefix or trunk-group, and finally configure Strunk-group or Prefix, but outgoing calls routing logic process in AR routers is ( ).
A. callroute->prefix->trunk-group
B. prefix->callroute->trunk-group
C. callroute->trunk-group->prefix
D. prefix->trunk-group->callroute
Answer: B
In a multi-node centralized networking scenario, not considering dual-standby scenario, how many SIP server addresses should be filled out by the users on center node?
A. 1
B. 2
C. 3
D. 4
Answer: A
An enterprise is equipped with headquarters and branch offices, a total of 1,000 employees, having the cross-regional, cross-sectoral collaboration communication needs.
In this case, what is the most suitable deployment mode?
A. single node network
B. multi-node centralized networking
C. multi-node distributed network
Answer: B
About the dual-standby function of U1900 Series Unified Gateway, which of the following statement is correct? (Multiple Choice)
A. When the master node fails, the system automatically triggers the switchover mechanism, and all business is transferred to the standby node for processing.
B. Master node returns normal from a failure, the data during standby node takeover business will be synchronized to the Master node
C. Under normal circumstances, the master node and standby node can synchronize data
D. Master node returns normal from a failure, the data during standby node takeover business will be lost after the master node recovery
Answer: AD
In AR, the main function of the CCM module is Interactive message tracking between internal module, used for positioning call failure formative stage.
A. True
B. False
Answer: B
In eSpace UC solution, the recording system LAN networking deploy scheme set of SQL Server 2008 R2 standard database.
A. True
B. False
Answer: A
eSpace suddenly off when using, which of the following statement about the possible reason is error ?
A. eSpace server exception
B. Unified gateway side abnormal
C. eSpace Server 8011 port is disabled by firewall
D. Unstable network between the local machine and the eSpace server
Answer: B
About linked business, the following statements correct is ().(multiple choice)
A. eSpace Desktop can only bind a IP Phone, external display a number
B. eSpace and IP Phone as long as there is a call, external release status as calling
C. when eSpace and IP phone linkage can be connected at the same time
D. linkage of IP phone and eSpace Desktop can register under different U1900
Answer: AB
Passcert H11-828-ENU Exam is the most valued and demanded exam. Passing exam is not an easy task but with the help of our training materials you will pass your in first attempt confidently. Our Passcert HCNP-UC(Fast Track) H11-828-ENU practice exam have been compiled under high quality checks and with the supervision of extremely qualified and skilled staff H11-828-ENU exam members.